Jericho's Room Finished! (almost)
...and just in time for the homecoming of Shadrach and Moses (projected sometime between Friday and Sunday!)
The final phase of renovation in Jericho's room was focused on the floors. The excessive amounts of adhesive, water damage, delay in ordered wood and the complications of custom planing and "routing" the red oak all caused this to be a mammoth project. As with most projects I post on this blog, I owe their completion to a half dozen people who gave their time and talents.
| The room as a kitchen... |
| Adhesive! |
| Removing damaged wood |
Construction Zone
Thanks to: Steve for the assistance in fabricating the custom plank flooring
(5/16 thick and 1 1/2 wide!)
Thanks to: Steve for the assistance in fabricating the custom plank flooring
(5/16 thick and 1 1/2 wide!)
Patched in and sanded!
(Thanks to: Ben for carpentry, Father and Simeon for stripping, Susan and Brian for sanding)
Two coats of Cabot stain (pecan) and three coats of Varathane Oil-Based Semi-gloss
Thanks to: Warren and Pop Pop
We bought this bed along with two dressers more than a year ago in anticipation of this day!
What's left? Moulding. The original shoe molding has been sanded and awaits staining and sealing. We couldn't wait any longer to move furniture!
Saturday, March 2, 2013
Update: Why We Love\Hate the NICU
After a great prognosis Thursday night, Moses started having breathing incidents and low blood sugar levels. He went from nursing, to supplemental bottle feedings, to a feeding tube. Friday morning we were still hopeful that Shadrach could join us over on the "the good side" but he too began to struggle to control his sugars. The reality is, they are still premature. Premature babies just aren't ready to monitor every little thing on their own, including breathing and saving energy between feedings!
So we are back into that familiar routine (established with Jericho) of visits to the NICU. It is a place full of the most wonderful nurses but also very sick babies, much sicker than our own. Even as we gripe about the inconvenience, we're reminded how blessed we are.
Friday, March 1, 2013
Introducing...
Thursday, February 28, 2013
Babies on the way! Round of 16 announced!
Due to the imminent arrival of the twins, we are announcing the round of 16 winners!
Stay tuned for birth pictures and the final announcements.
We are beginning Petosin as I am typing!
Round of 16 (Left Side)
Elijah
Abraham
Abiathar
Bartholomew
Ezekial
Jeremiah
Abijah
Shadrach
Round of 16 (Right Side)
Isaiah
Francis
Moses
Phillip
Otto
Apollo
Levi
Thomas
Wednesday, February 27, 2013
And the winners are...
Round of 32 (left side)
Mordechai
Elijah
Xavier
Abraham
Abiathar
Jonah
Bartholomew
Sebastian
Jethro
Ezekial
Jeremiah
Oliver
Abijah
Ethan
Shadrach
Simon
Round of 32 (right side)
Isaiah
Elliot
Jeremiah
Francis
Moses
Eli
Phillip
Aaron
Lucas
Otto
Jefferson
Apollo
Levi
Hezekiah
Obadiah
Thomas
Monday, February 25, 2013
A Double Trouble Baby Name Bracket!
![]() |
| 34 weeks! Photography by Sarah Mock |
In anticipation of the birth of our baby boys, we've created a name bracket for you to test how well you know Laura and I. Fill it out and then check back for updates on each round of this friendly competition. Kudos to those special few who manage to guess even one of the two chosen names. On each side of the bracket, one of the names is for real!
Fill out your baby name bracket here!
Extremely tentative schedule:
Round of 32- Wednesday, Feb. 27
Round of 16- Friday, March 1
Saturday, February 2, 2013
An Upcycled Wooden Play Kitchen for Jericho!
Happy Birthday Jericho!
As our daughter turned two last week, we were able to give her a really awesome present. Inspired a while ago from a Pinterest posting, Laura suggested we find a small cabinet at Goodwill or Resource York to turn into a play kitchen. But as it turns out, the perfect start to this project was already in our house: a section from the upper cabinets over the fridge in the old upstairs bedroom (in the process of becoming Jericho's new room). Follow along in the transformation!
1) An old cabinet
2) With one door turned vertical and new shelving added
3) A "backplash" and the "stovetop" added
4) Trimmed out
5) Painting in progress
6) Final details including sink and burners
Cheese!

With just a few exceptions,
everything in this project was recycled or we already owned.
Hardware from the cabinets was reused, the backsplash was made with plywood and 2x4s rescued from a demo project in the basement, the trim came from the old kitchen on the first floor and leftovers in the garage from the 1970s basement finishing job. All of the paint we already owned, used in our real kitchen. The shelf was made of the bottom of a cabinet drawer and the wheels were mounted on recycled 2x4s. The stove insulation was a leftover scrap from our kitchen remodel and finally, the wire baskets inside the stove and on the side came from our restored 1950s MacDougall built-ins. We bought: 4 wheels, epoxy, two wooden knobs and two flat wooden cut-outs, and a dog bowl.
Jericho's Room- Update!
A few photos from the latest work in Jericho's room. Progress due in large part to the help of Jeff, Pop, and my father!
Friday, January 4, 2013
Swinging a Hammer Into the New Year
Transitioning a second story kitchen into a bedroom is harder than you might imagine. Here's a shot of the cabinets mostly demolished. The uppers have already been moved to the garage to make storage space (imagine the white area on the wall as the "backsplash"). In this picture you can see a number of potentially deadly DIY projects:
Well, it's still a work in progress. I was able to reuse baseboard from the kitchen in this room, except for one stretch. I also found trim work I had saved to match the existing wood around the closet door. I would not have been able to match it otherwise, short of custom millwork (hah!). What remains? SERIOUS flooring work (2 inch x 5/16 straight edge is on order- I will have to rip each piece), then refinishing the entire floor and lots of painting. Stay tuned!
| The rest of the demo work reveals missing baseboard and miserable water damage to the flooring. |
| W. M. Rutter- apparently a now defunct WV lumber company. Difficult to obtain 1 1/2 x 5/16 red oak strip flooring. |
Well, it's still a work in progress. I was able to reuse baseboard from the kitchen in this room, except for one stretch. I also found trim work I had saved to match the existing wood around the closet door. I would not have been able to match it otherwise, short of custom millwork (hah!). What remains? SERIOUS flooring work (2 inch x 5/16 straight edge is on order- I will have to rip each piece), then refinishing the entire floor and lots of painting. Stay tuned!